PUBLIC-PRIVATE PARTNERSHIP SEBAGAI SOLUSI PEMBANGUNAN INFRASTRUKTUR: STUDI LITERATUR PROYEK BANDARA KEDIRI

Authors

  • Alviana Ramadhani Universitas Hang Tuah
  • Moh. Musleh Universitas Hang Tuah
  • M. Husni Tamrin Universitas Hang Tuah
  • Agus Subianto Universitas Hang Tuah

DOI:

https://doi.org/10.22225/jcpa.5.1.2025.1-14

Keywords:

Infrastructure, Public-Private Partnership, Kediri Airport, Government-business partnership, Sustainable Development

Abstract

Quality and sustainable infrastructure development is a major challenge for developing countries like Indonesia, especially in the face of budget constraints and administrative capabilities. The Public-Private Partnership (PPP) approach has emerged as a strategic solution to overcome these obstacles by involving the private sector in providing resources, technical expertise, and operational efficiency. This study aims to apply the PPP model in infrastructure development in Indonesia with a focus on the Kediri Airport project as a case study. The methodology used is an in-depth literature study of secondary data related to this project, including government policies, financing schemes, and technical implementation. The Kediri Airport project is an example of the first PPP (Government and Business Entity Cooperation) initiated by a business entity (unsolicited), with a Design-Build-Finance-Operate-Maintain-Transfer (DBFOMT) scheme. This project is fully funded by PT Gudang Garam Tbk through its subsidiary without using the APBN, with a total investment reaching IDR 10.8 trillion. The results of the study show that the PPP approach allows for accelerated infrastructure development while reducing the government's financial burden. Kediri Airport successfully operated in April 2024 with an initial capacity of 1.5 million passengers per year and is designed to support wide-body aircraft such as the Boeing 777-300ER. The novelty of this research lies in the analysis of the unsolicited PPP model that has not been widely implemented in Indonesia and the potential of this project as a catalyst for regional economic development. These findings provide strategic insights for the development of PPP models in the future, especially in large-scale projects that focus on curiosity.

References

Adam, H., Manurung, A. H., Sembel, R., & Murdiono, J. (2023). The First Refinancing Of Railway Infrastructure In Indonesia: A Part of Public-Private Partnerships (PPP). Journal of Accounting and Finance Management, 4(5), 332–342.

Adiyanti, N. P., & Fathurrahman, R. (2021). Assessing critical success factors for PPP water project in Indonesia: Lessons from West Semarang. Policy & Governance Review, 5(2), 164–181.

Artanti, N. P. (2021). Multiplier Effect Proyek Strategis Nasional Pembangunan Bandara Kediri.

Aufa, F. (2023). Gerakan Perlawanan Masyarakat Terhadap Pembangunan Bandara Kediri (Studi Kasus Perlawanan Komunitas FPR Dalam Mempertahankan Aset Budaya). IAIN Kediri.

Creswell, J. W., & Poth, C. N. (2018). Qualitative Inquiry & Research Design: Choosing Among Five Approaches (4th ed.). SAGE Publications.

Cui, C., Liu, Y., Hope, A., & Wang, J. (2018). Review of studies on the public–private partnerships (PPP) for infrastructure projects. International Journal of Project Management, 36(5), 773–794.

Junari, J., Widodo, S., & Prissando, F. A. (2022). Analisis Dampak Perubahan Sosial Dan Ekonomi Masyarakat Akibat Pembangunan Bandara Internasional Dhoho Kediri (Studi Di Desa Tiron Kabupaten Kediri). Jurnal Mediasosian: Jurnal Ilmu Sosial Dan Administrasi Negara, 6(2), 363–380.

Kadang, S. (2022). Improving Research Infrastructure in Indonesia through Public Private Partnership (PPP). The Journal of Indonesia Sustainable Development Planning, 3(2), 149–163.

Keputusan Menteri Perhubungan Nomor KM 28 Tahun 2020 tentang Penetapan Lokasi Bandar Udara Baru di Kabupaten Kediri Provinsi Jawa Timur.

Latief, R. U., Pallu, S., Adisasmita, S. A., Aly, S. H., & Suyuti, A. (2014). Risk Response Preference on Public-Private Partnership (PPP) in Indonesia Airport Infrastructure Development. International Journal of Application on Innovation in Engineering & Management, 3(8), 120–124.

Musleh, M. (2023). Tata Kelola Wisata Pulau Gili Iyang: Perspektif Community Based Tourism. Journal of Contemporary Public Administration, 3(1), 42–50. https://doi.org/10.22225/jcpa.3.1.6853.42-50.

Musleh, M., & Rosa, N. S. (2024). Strategi Pemanfaatan Kearifan Lokal dalam pengembangan Desa Wisata Pandean Kabupaten Trenggalek. Journal of Contemporary Public Administration (JCPA), 4(1), 36–44. https://doi.org/https://doi.org/10.22225/jcpa.4.1.2024.36-44.

Nahdi, M., Widayati, N., Wibowo, M. A., Sari, E. M., Tamin, R. Z., & Thohirin, A. (2024). Examining Solicited Projects of Public–Private Partnerships (PPP) in the Initiative of Indonesian Government. Buildings, 14(6), 1870.

Osei-Kyei, R., & Chan, A. P. C. (2015). Review of studies on the Critical Success Factors for Public–Private Partnership (PPP) projects from 1990 to 2013. International Journal of Project Management, 33(6), 1335–1346.

Pambudi, J. A. A., Dayana, I., Alfirman, D. M., Susanto, D., & Widianingrum, R. (2023). Accelerating Indonesia sustainable infrastructure development through ESG initiatives in PPP ecosystem. IOP Conference Series: Earth and Environmental Science, 1266(1), 12020.

Pangeran, M. H., Pribadi, K. S., Wirahadikusumah, R. D., & Notodarmojo, S. (2012). Assessing risk management capability of public sector organizations related to PPP scheme development for water supply in Indonesia. Civil Engineering Dimension, 14(1), 26–35.

Peraturan Presiden Nomor 3 Tahun 2018 tentang Penjabat Sekretaris Daerah.

Peraturan Presiden Nomor 56 Tahun 2018 tentang Perubahan Kedua Atas Peraturan Presiden Nomor 3 Tahun 2016 tentang Percepatan Pelaksanaan Proyek Strategis Nasional.

Perdana. (2021). KEMITRAAN SWASTA DAN PEMERINTAH (PUBLIC PRIVATE PARTERSHIPS) Modul Pelatihan Kepemimpinan Nasional Tingkat II. Lembaga Administrasi Negara.

Rafani, S. R., Azmi, M. U., Musleh, M., & Tamrin, M. H. (2024). Model Kerjasama Build-Operate-Transfer (BOT) Dalam Pengelolaan Pasar Turi Baru di Surabaya. Kolaborasi: Jurnal Administrasi Publik, 10(1), 22–36. https://doi.org/https://doi.org/10.26618/kjap.v10i1.13070.

Ramadhani, A. A. (2024). Perilaku Konsumsi Warga Akibat Dari Pembebasan Lahan Pembangunan Bandara Dhoho Kediri (Studi Kasus Warga Desa Bulusari Kecamatan Tarokan Kabupaten Kediri). IAIN Kediri.

Rohman, M. A. (2022). Assessment of the government’s role performance in Public-Private Partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(2), 239–258.

Rozy, E. F., & Koswara, A. Y. (2017). Karakteristik Infrastruktur Pendukung Wisata Pantai Sanggar Kabupaten Tulungagung. Sepuluh Nopember Institute of Technology.

Sharma, C. (2012). Determinants of PPP in infrastructure in developing economies. Transforming Government: People, Process and Policy, 6(2), 149–166.

Utama, D. (2010). Prinsip dan Strategi Penerapan “public private partnership” dalam penyediaan infrastruktur transportasi. Jurnal Sains Dan Teknologi Indonesia, 12(3), 145–151.

Wibowo, A., & Alfen, H. W. (2015). Government-led critical success factors in PPP infrastructure development. Built Environment Project and Asset Management, 5(1), 121–134.

Yin, R. K. (2009). Case study research: Design and methods (4th ed.). Sage.

Zamroni, A., Sugarbo, O., Trisnaning, P. T., Sagala, S. T., & Putra, A. S. (2021). Geochemical approach for seawater intrusion assessment in the area around Yogyakarta International Airport, Indonesia. The Iraqi Geological Journal, 1–11.

Published

2025-05-30