PERENCANAAN BIAYA MENGGUNAKAN PERHITUNGAN BIAYA RIIL PADA PROYEK PERUMAHAN

Authors

  • Mohammad Djaelani Universitas Sunan Giri Surabaya, Jawa Timur, Indonesia
  • Arif Rachman Putra Universitas Sunan Giri Surabaya, Jawa Timur, Indonesia
  • Didit Darmawan Universitas Sunan Giri Surabaya, Jawa Timur, Indonesia
  • Utami Puji Lestari Universitas Sunan Giri Surabaya, Jawa Timur, Indonesia
  • Eli Retnowati Universitas Sunan Giri Surabaya, Jawa Timur, Indonesia

DOI:

https://doi.org/10.22225/pd.11.2.5363.207-213

Keywords:

budget, construction, housing construction

Abstract

In the implementation of construction projects, several stages need to be carried out before the main activities are carried out. Construction activities start from a feasibility survey on site, design, budgeting, construction implementation, and evaluation. In order to be able to carry out all activities, contractors need to implement construction management in order to ensure the work runs with minimal obstacles and achieves success. An important stage in construction activities is cost budgeting. Budgeting is structured based on the principles of effectiveness of results and cost efficiency. Some contractors always skip this stage because they have experience or carry out small construction activities. As a result, construction activities stopped temporarily and could not even continue. This study aims to determine budget management to perform cost calculations on housing development activities. The study was conducted in a construction project in Alana Regency Cerme, Cerme District, Gresik. Based on the calculation of the budgeting, it is obtained costing with an estimated value of Rp. 222,287,554.55. In the implementation of the construction obtained a total cost of Rp. 206,632,729.55. This shows the existence of a profit with a value of Rp. 15,654,825.00.

References

Aibinu, A. A., & Jagboro, G. O. (2002). The Effects of Construction Delays on Project Delivery in Nigerian Construction Industry. International Journal of Project Management, 20, 593–599.

Aibinu, A. A., & Pasco, T. (2008). The Accuracy of Pretender Building Cost Estimates in Australia. Construction Management and Economics, 26(12), 1257-1269.

Akintoye, A. (2000). Analysis of Factors Influencing Project Cost Estimating Practice. Construction Management And Economics, 18(1), 77-89.

Bernold, L. E., & Abourizk, S. M. (2010). Managing Performance in Construction. New Jersey: John Wiley & Sons, Inc.

Briones, C. T. L. (2021). Constructing Cost of Living Indexes: Ideas and Individuals, Argentina, 1918–35. History of Political Economy , 53(1), 57–87.

Cafï¬eri, J.J., Love, P. E., Whyte, A., & Ahiaga-Dagbui, D. D. (2018). Planning for Production in Construction: Controlling Costs in Majorcapital Projects. Prodution Planing Control, 29, 41–50.

Clough, R. H. (1986). Construction Contracting. New York: John Wiley and Sons.

Chou, J-S., Chen, H-M., Hou, C-C., & Lin, C-W. (2010). Visualized EVM system for assessing project performance. Automation in Construction, 19(5), 596-607.

Darmawan, D., & Djaelani, M. (2021). Correlation of Work Stress and Performance of Construction Project Manager. ARRUS Journal of Engineering and Technology, 1(2), 55-59.

Djaelani, M., Sinambela, E. A., Darmawan, D., & Mardikaningsih, R. (2021). Strengthening the Culture of Occupational Safety and Health as a Contributor to the Formation of Construction Project Performance. Journal of Marketing and Business Research, 1(2), 59-70.

Djaelani, M., & Darmawan, D. (2021). Dulux Wall Paint Purchase Decision: The Role of Brand Image, Price, And Product Quality on Consumer Behavior of Paint Products. Jurnal Simki Economic, 4(2), 150-160.

Djaelani, M., Darmawan, D., & Amri, M. W. (2022). Study of Concrete: Quality and Economic. Bulletin of Science, Technology and Society, 1(1), 1-3.

Ekung, S., & Onwusonye, S. I. J. (2017). Leveraging Cost Effective Tool For Risk Allowance Estimation in Building Project Delivery. Journal of Environmental Design, 12(2), 11-21.

Loosemore, M. (2000). Crisis Management in Construction Projects. Reston, VA: American Society of Civil Engineers,.

McAdam, R., Hazlett, S-A., & Galbraith, B. (2014). The role of performance measurement models in multi level alignment: an exploratory case analysis in the utilities sector. International Journal of Operations and Production Management, 34(9), 1153-1183.

Sianturi, N. A. T., Darmawan, D., Anwar, M. S., & Putra, A. R. (2022). Material Management Effectiveness. Bulletin of Science, Technology and Society, 1(1), 7-10.

Sinambela, E. A., & Djaelani, M. (2022). Cost Behavior Analysis and Categorization. Journal of Social Science Studies, 2(1), 13-16.

Smith, J., O'Keeffe, N., Georgiou, J., & Love, P. E. D. (2004). Auditing Construction Costs During Building Design: A Case Study of Cost Planning in Action. Managerial Auditing Journal, 19(2), 259-271.

Walker, A. (2015). Project Management in Construction, 6th Ed. Oxford: Blackwell Science.

Downloads

Published

2022-11-19

Issue

Section

Articles