IDENTIFIKASI RISIKO PELAKSANAAN PEMBANGUNAN PROYEK GEDUNG HIGHRISE BUILDING DI HOTEL GRAND DAFAM SIGNATURE YOGYAKARTA

Authors

  • M.Hendra Aulia Rahman Program Studi Teknik Sipil, Universitas 17 Agustus 1945 Surabaya, Jawa Timur, Indonesia
  • Hanie Teki Tjendani Program Studi Teknik Sipil, Universitas 17 Agustus 1945 Surabaya, Jawa Timur, Indonesia

DOI:

https://doi.org/10.22225/pd.11.2.5336.177-185

Keywords:

building project, highrise building, risk identification

Abstract

This research was conducted to the identifying dominant risks and risk allocation Grand Dafam Signature Hotel Yogyakarta Building Project. Using quantitative research methods. The research sample amounted to 18 people, including expert staff from the implementing contractor and supervisory consultant. Data collection is based on the distribution of primary data, namely questionnaires and interviews with selected respondents and secondary data, research literature and previous similar project data. Based on the output of the data processing stages, there is a dominant risk. There were 27 selected risk variables, from the analysis results obtained 6 dominant risk variables, namely the increase in material prices, material damage or loss, occupational health and safety (K3) at the project location due to safety regulations that were not implemented in the field, design changes, schedule changes. execution of work and late payment in the contract, based on the distribution of the results of the risk allocation assessment, 17 (seventeen) risks are allocated to the contractor, 3 (three) risks are allocated to the owner, 7 (seven) risks are allocated jointly (shared), with a percentage distribution of risk allocation to the contractor 63%, the owner 11% and allocated jointly (shared) of 26%.

References

Abraham, H. (2016). Analisa Faktor-Faktor yang Mempengaruhi Kinerja Waktu Pelaksanaan Proyek Konstruksi di Wilayah Surabaya. Jurnal Rekayasa Teknik Sipil, 3(3), 55-63.

Asmarantaka, N.S. (2014). Analisis Resiko yang Berpengaruh Terhadap Kinerja Proyek pada Pembangunan Hotel Batiqa Palembang. Jurnal Teknik Sipil dan Lingkungan, 2(3), 483-491.

Dita, A. O. F., Ratnaningsih, A., & Sukmawati, S. (2017). Identifikasi Risiko Dominan Internal Non Teknis Yang Berdampak Pada Biaya Konstruksi High Rise Building Menggunakan Metode Severity Index Identification. Jurnal Rekayasa Sipil dan Lingkungan, 1(2), 178–191.

Ervianto, W. I. (2016). Manajemen Proyek Konstruksi. Yogyakarta: Andi Offset.

Farihin, W. A., Alamsyah, D. F., & Setijo Pudjihardjo, H. (2020). Analisis Resiko Pelaksanaan Pembangunan Proyek Konstruksi Bangunan Gedung IGD RSUD Ajibarang pada saat Pandemi COVID-19. LLDIKTI Wilayah VI, 1, 1–13.

Fitria, A. (2017). Assesment Manajemen Risiko pada Proyek Konstruksi Highrise Building (Studi kasus: Proyek Tunjungan Plaza 6 Surabaya dan Proyek One East Residence Apartment) (Tugas Akhir). Jurusan Teknik Sipil Universitas Jember.

Gunawan, J., Andi, & Surono, W. (2015). Identifikasi dan Alokasi Risiko-Risiko pada Proyek Superblok di Surabaya. Jurnal Dimensi Pratama Teknik Sipil, 4(2), 1–8.

Hanafi, M. (2006). Manajemen Risiko, Yogyakarta: Unit Penerbit dan Percetakan Sekolah Tinggi Manajemen YKPN.

Meylani, R. (2018). Analisa Risiko Konstruksi pada Proyek Pembangunan Gedung (Studi Kasus : Pembangunan Rumah Susun Medan) (Tugas Akhir). Universitas Sumatera Utara.

Nurfarida, S. (2019). Alokasi Risiko Proyek Pembangunan Jalan dengan Sistem Performance Based Contract (Studi Kasus Proyek Peningkatan Jalan Demak - Trengguli) (Tugas Akhir).

Nurlela, & Suprapto, H. (2014). Identifikasi dan Analisis Manajemen Risiko Pada Proyek Pembangunan Infrastruktur Bangunan Gedung Bertingkat. Jurnal Ilmiah Desain dan Konstruksi, 13(2), 114–124.

Nurudin, M., & Huda, M. (2020). Identifikasi Risiko Pelaksanaan Pembangunan Gedung Bertingkat milik Pemerintah Kota Surabaya.

Ridhamaulayana, D., G. Prakoso, W., & A. Megawati, L. (2020). Analisis Risiko Konstruksi pada Proyek Pembangunan Gedung Bertingkat di Kota Bogor. Teknik Sipil, 1, 1–14.

Soemarno, M. S. (2007). Risiko Pengunaan Lahandan Analisisnya Laboratorium PPJP Jurusan Tanah. Malang: FPUB.

Vignata, A. V. (2020). Analisis Mitigasi Risiko yang Berpengaruh pada Proyek Jalan (Studi Kasus : Pekerjaan Konstruksi Paket MYC Pembangunan Jalan Lingkar Timur Waduk Jatigede) (Thesis). Program Studi Magister Teknik Sipil Universitas 17 Agustus 1945 Surabaya.

Downloads

Published

2022-11-19

Issue

Section

Articles