Implementasi BIM dengan Autodesk Revit 2025 pada quantity take-off material struktur Gedung Plaza Airlangga (Unair) tahap 1 terhadap volume
DOI:
https://doi.org/10.22225/pd.14.1.12449.142-151Keywords:
Autodesk Revit 2025, building information modeling, quantity take-off, work volumeAbstract
Rapid development in the construction sector is strongly influenced by its crucial and efficient functions. This drives the construction industry towards better integration. Currently, advances in technology and communication play an important role in overcoming various challenges, one of which is through the implementation of Building Information Modeling (BIM). This approach supports more integrated design and construction processes, resulting in higher efficiency. A primary challenge in construction service provision is the discrepancy in work volume, which can affect project success. By using Autodesk Revit 2025, the implementation of 5D BIM for material Quantity Take-Off can provide higher accuracy in volume estimation. In its implementation, data is processed using Autodesk Revit 2025 BIM software integrated with Microsoft Excel for further analysis. The results show that total volume calculations using Autodesk Revit are more precise compared to conventional methods. The volume of concrete work based on BIM is 2,005.35 m³, which is 83.31 m³ lower than the conventional method at 2,088.66 m³. Meanwhile, the reinforcement volume based on BIM is 354,670.98 kg, which is 29,024.91 kg lower than the conventional method at 383,695.89 kg. The contribution of this research is the demonstration that the implementation of 5D BIM using Autodesk Revit 2025 significantly improves the accuracy of structural work volume calculations compared to conventional methods, thereby helping to reduce volume discrepancies in construction projects and enhancing the reliability of material quantity planning.
References
Anjani, A., Bayzoni, Husni, H. R., & Niken, C. (2022). Penerapan Building Information Modeling (BIM) Menggunakan Software Autodesk Revit Pada Gedung 4 Rumah Sakit Pendidikan Peguruan Tinggi Negeri (RSPTN) Universitas Lampung. JRSDD, 10(1), 87–98.
Deni, D., Karsono, B., Mirsa, R., Safyan, A., & Saputra, E. (2021). The Divergence Between Prophet’s Masjid and Present Masjid: An Architectural Essay. International Journal of Engineering, Science and Information Technology, 1(2), 130–134. https://doi.org/10.52088/ijesty.v1i2.136
Dhou, Y. N., & Susanto, A. (2015). Analisis Perbandingan Perhitungan Metode Konvensional dan Building Information Modelling (BIM) terhadap Volume serta Biaya Pekerjaan Konstruksi. 2023: Prosiding Seminar Nasional Teknik Sipil UMS , 489–496.
Fakhruddin, Parung, H., Tjaronge, M. W., Djamaluddin, R., Irmawaty, R., Amiruddin, A. A., Djamaluddin, A. R., Harianto, T., Muhiddin, A. B., Arsyad, A., & Nur, S. H. (2019). Sosialisasi Aplikasi Teknologi Building Information Modelling (BIM) pada Sektor Konstruksi Indonesia. JURNAL TEPAT: Applied Technology Journal for Community Engagement and Services, 2(2), 112–119. https://doi.org/10.25042/jurnal_tepat.v2i2.82
Karsono, B., Shihadeh A. Arar, M., Luthfi, I., & Deni, D. (2022). Dominating the Space: Uncover the Existence of Street Vendors in Public Space, The case of Tengku Amir Hamzah Square, Stabat, Indonesia. International Journal of Engineering, Science and Information Technology, 2(4), 144–150. https://doi.org/10.52088/ijesty.v2i4.394
Krisnawan, A. (2025). Analisis Komparasi Perhitungan Quantity Take off Pekerjaan Struktural Antara Metode BIM dengan Konvensional Terhadap Realisasi Lapangan (Studi Kasus: Proyek Gedung Laboratorium Riset Jurusan Kimia Universitas Islam Indonesia) [Skripsi].
Nugroho, P. S., Latief, Y., Mulyono, B., & Zaman, A. A. F. N. (2022). Penggunaan BIM untuk Meningkatkan Keselamatan Kebakaran pada Bangunan Gedung Tinggi. Jurnal Komposit, 6(1), 29. https://doi.org/10.32832/komposit.v6i1.6738
Pamungkas, A. P. (2022). Analisis Optimalisasi Perhitungan RAB Menggunakan Revit (Studi Kasus: Pembangunan Gedung Bank BRI Jl. Sisingamangaraja - Medan Kota) [Skripsi].
Reista, I. A., Annisa, A., & Ilham, I. (2022). Implementasi Building Information Modelling (BIM) dalam Estimasi Volume Pekerjaan Struktural dan Arsitektural. Journal of Sustainable Construction, 2(1), 13–22. https://doi.org/10.26593/josc.v2i1.6135
Rizqy, R. M., Martina, N., & Purwanto, H. (2021). Perbandingan Metode Konvensional Dengan Bim Terhadap Efisiensi Biaya, Mutu, Waktu. Construction and Material Journal, 3(1), 15–24. https://doi.org/10.32722/cmj.v3i1.3506
Sadad, I., Jaya, F. H., & Januar, I. W. (2022). Implementasi BIM Take Off Quantity Material Struktur Abutment Jembatan Terhadap Volume Rencana. Teknika Sains: Jurnal Ilmu Teknik, 7(2), 91–97. https://doi.org/10.24967/teksis.v7i2.1960
Yadi, S., Yusuf, E., Yusuf, E., Soebandono, B., & Soebandono, B. (2023). Quantity Take Off pada Perencanaan Gedung Apartemen Menggunakan BIM Revit. Jurnal TeKLA, 5(1), 47. https://doi.org/10.35314/tekla.v5i1.3422
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Dwi Nur Wahyudi, Masca Indra Triana

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
1. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).