PRIORITIZING FLOOD MITIGATION IN VILLAGES AFFECTED BY THE PALASARI DAM BREAK USING TOPSIS
DOI:
https://doi.org/10.22225/jipe.4.1.2025.10-15Keywords:
dams, floods, TOPSIS, priority management, disaster mitigationAbstract
Dam collapse is a disaster that has the potential to have a significant impact on communities in downstream areas. This study aims to determine priorities for handling villages affected by flooding due to the collapse of the Palasari Dam in Jembrana Regency, Bali, using the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) method. The data used was obtained from the results of hazard classification analysis based on InaSAFE software which includes four main parameters, namely the area of inundation, length of affected roads, number of affected buildings and number of affected populations. Each parameter is grouped by village and given a weight based on the principle of disaster vulnerability by placing life safety as the main priority. The results of the analysis show that the villages of Nusasari, Candikusuma, and Tuwed are the villages with the highest treatment priority, each with a preference value of 0.760; 0.605; and 0.524. The TOPSIS method has proven effective in combining spatially based quantitative data to support objective and systematic disaster mitigation decision making. This research also provides a basis for preparing a more adaptive Emergency Action Plan (EAP).
References
[1] BWS Bali-Penida, "Laporan Akhir Updating AKNOP Bendungan Palasari tahun 2023," Denpasar, 2023.
[2] M. A. F. Khairi, H. Suprijanto, and A. P. Hendrawan, "Analisis Keruntuhan Bendungan Rukoh Kabupaten Pidie Menggunakan Aplikasi HEC-RAS Dan Berbasis InaSAFE," Jurnal Teknologi dan Rekayasa Sumber Daya Air, vol. 2, no. 1, pp. 1–66, 2022. doi:10.21776/ub.jtresda.2022.002.01.05
[3] D. C. Siregar, "Analisis Variabilitas Curah Hujan dan Suhu Udara di Tanjungpinang," Jurnal Material dan Energi Indonesia, vol. 9, no. 2, p. 45, 2020. doi:10.24198/jmei.v9i2.23834
[4] B. Suhada, H. Nugroho, S. Suprapto, and H. Herawati, "Analisis Keruntuhan Bendungan Akibat Piping dan Pemetaan Genangan Banjir (Studi Kasus: Bendungan Saguling)," Jurnal Saintis, vol. 22, no. 1, pp. 1–10, 2022. doi:10.25299/saintis.2022.vol22(01).8081
[5] B. Harsoyo, "Analisis Faktor Penyebab Jebolnya Tanggul Situ Gintung," Jurnal Air Indonesia, vol. 6, no. 1, 2018. doi:10.29122/jai.v6i1.2453
[6] R. A. Nabilah, D. Sutjiningsih, E. Anggraheni, and S. Murniningsih, "Dam Break Analysis of Situ Gintung Dam Collapse Reconstruction," IOP Conference Series: Earth and Environmental Science, vol. 599, no. 1, p. 012064, 2020. doi:10.1088/1755-1315/599/1/012064
[7] J. Sujono, "Hydrological Analysis of the Situ Gintung Dam Failure," Journal of Disaster Research, vol. 7, no. 5, pp. 590–594, 2012. doi:10.20965/jdr.2012.p0590
[8] Kementerian PUPR, "Peraturan Menteri PUPR No. 7 Tahun 2023 tentang Perubahan Kedua Atas Peraturan Menteri PUPR No. 27/PRT/M/2015 Tentang Bendungan," 2023. [Online]. Available: https://jdih.pu.go.id/detail-dokumen/2721/1
[9] T. Kristina, "Sistem Pendukung Keputusan Dengan Menggunakan Metode TOPSIS Untuk Pemilihan Lokasi Pendirian Grosir Pulsa," Paradigma, vol. 20, no. 1, pp. 8–12, 2018. [Online]. Available: https://ejournal.bsi.ac.id/ejurnal/index.php/paradigma/article/view/2908
[10] N. L. P. Prabandari, H. Siswoyo, and R. Haribowo, "Penentuan Skala Prioritas Pengembangan Potensi Mata Air untuk Irigasi Menggunakan Metode TOPSIS di Kecamatan Singosari Kabupaten Malang," Jurnal Ilmiah Universitas Batanghari Jambi, vol. 21, no. 3, p. 996, 2021. doi:10.33087/jiubj.v21i3.1580
[11] C.-L. Hwang and K. Yoon, "Methods for Multiple Attribute Decision Making," in Multiple Attribute Decision Making: Methods and Applications A State-of-the-Art Survey, Berlin, Heidelberg: Springer, 1981, pp. 58–191. doi:10.1007/978-3-642-48318-9_3
[12] L. Hu, X. Yang, Q. Li, and S. Li, "Numerical Simulation and Risk Assessment of Cascade Reservoir Dam-Break," Water, vol. 12, no. 6, p. 1730, 2020. doi:10.3390/w12061730
[13] E. Javadian, "Urban flood vulnerability assessment using machine learning and TOPSIS," Sustainable Cities and Society, vol. 74, p. 103219, 2021. doi:10.1016/j.scs.2021.103219
[14] Y. Li, "Flood risk assessment using CV-TOPSIS in Belt and Road regions," Georisk, vol. 14, pp. 166–179, 2020. doi:10.1080/17499518.2020.1765703
[15] A. I. Pathan et al., "Flood risk mapping using geospatial and multi-criteria analysis: A case study of Navsari, India," EGU General Assembly, Vienna, Austria, 2022. doi:10.5194/egusphere-egu22-2418
[16] G. Rohmingthangi, F. C. Kypacharili, A. B. Mukherjee, and B. S. Mipun, "Landslide Risk Dynamics Modeling Using AHP-TOPSIS Model...," in Intelligent Data Engineering and Analytics, Singapore: Springer, 2022, pp. 397–410. doi:10.1007/978-981-16-6624-7_40
[17] A. Miardini and H. Nugraha, "Penentuan Sub Das Prioritas Penanganan Banjir Di Das Bodri, Jawa Tengah," Majalah Ilmiah Globe, vol. 22, no. 2, p. 93, 2020. doi:10.24895/mig.2020.22-2.992
[18] G. Pariartha, A. Goonetilleke, P. Egodawatta, and H. Mirfenderesk, "The prediction of flood damage in coastal urban areas," IOP Conf. Ser.: Earth Environ. Sci., vol. 419, no. 1, 2020. doi:10.1088/1755-1315/419/1/012136
[19] T. M. Aribawa, "Assessment of Flood Propagation Due to Several Dams Break in Banten Province," Int. J. GEOMATE, vol. 20, no. 81, 2021. doi:10.21660/2021.81.j2082
[20] G. Juliastuti and O. Setyandito, "Dam Break Analysis and Flood Inundation Map of Krisak Dam for Emergency Action Plan," 2017. doi:10.1063/1.5011615
[21] Australia-Indonesia Facility for Disaster Reduction, "InaSAFE User Manual," 2014.
[22] N. L. P. Prabandari, I. P. G. S. Pariartha, and S. G. Tonyes, "Analisa debit banjir rancangan Bendungan Palasari menggunakan," Padur J. Tek. Sipil Univ. Warmadewa. In press.
[23] OpenStreetMap Contributors, "OpenStreetMap," OpenStreetMap Foundation. Accessed: Dec. 15, 2024. [Online]. Available: https://www.openstreetmap.org
[24] BNPB, "Peraturan Kepala BNPB No. 2 Tahun 2012 tentang Pedoman Umum Penyusunan Rencana Penanggulangan Bencana," Jakarta, 2012. [Online]. Available: https://bpbd.natunakab.go.id/wp-content/uploads/2024/03/Peraturan-Kepala-BNPB-No-02-Tahun-2012.pdf
[25] A. Hamid and D. M. Midyanti, "Penerapan Metode Topsis Dalam Penentuan Skala Prioritas Rehabilitasi Jaringan Irigasi Daerah Ketiat B Bengkayang," Simetris J. Tek. Mesin Elektro dan Ilmu Komputer, vol. 10, no. 1, pp. 295–302, 2019. doi:10.24176/simet.v10i1.2979
[26] Y. H. J. A, M. Musyirifah, and F. Wajidi, "Sistem Pendukung Keputusan Penerima Bantuan Bencana Alam Menggunakan Metode Topsis," J. Komput. dan Inform., vol. 11, no. 2, pp. 185–194, 2023. doi:10.35508/jicon.v11i2.11178
[27] N. Sururi, K. Kusrini, and S. Sudarmawan, "Penentuan Wali Kelas Yang Ideal Menggunakan Metode TOPSIS," Creat. Inf. Technol. J., vol. 5, no. 2, p. 85, 2019. doi:10.24076/citec.2018v5i2.163
[28] A. Suryandini and I. Indriyati, "Sistem Pendukung Keputusan Untuk Penentuan Minat Peserta Didik Di SMA Menggunakan Metode TOPSIS," J. Masy. Inform., vol. 6, no. 12, pp. 30–37, 2015. doi:10.14710/jmasif.6.12.11116
[29] M. Y. Bahtiar, "Sistem Pendukung Keputusan Pengangkatan Karyawan Kontrak Menjadi Karyawan Tetap Dengan Menggunakan Metode Topsis," Indexia Infomatic Comput. Intell. J., vol. 4, no. 2, p. 14, 2022. doi:10.30587/indexia.v4i2.4329
[30] K. Smith et al., Environmental Hazards: Assessing Risk and Reducing Disaster, 7th ed. Routledge, 2023. doi:10.4324/9781351261647
[31] B. Wisner, P. Blaikie, T. Cannon, and I. Davis, At Risk: Natural Hazards, People’s Vulnerability, and Disasters. Routledge, 2012.
[32] S. L. Cutter, The Vulnerability of Place: Marginality, Risk, and Disaster. Routledge, 2003.
[33] K. Smith et al., Environmental Hazards Assessing Risk and Reducing Disaster. London: Routledge, 2023. doi:10.4324/9781351261647
[34] S. L. Cutter, B. J. Boruff, and W. L. Shirley, "Social Vulnerability to Environmental Hazards," Soc. Sci. Q., vol. 84, no. 2, pp. 242–261, 2003. doi:10.1111/1540-6237.8402002
[35] I. P. E. Sarassantika et al., "Assessing the Impact of Environmental Hazards on Educational Facility Structures in Karangasem Regency: Implications for Risk Mitigation," J. Infrastruct. Plan. Eng., vol. 3, no. 2, pp. 41–49, 2025. doi:10.22225/jipe.3.2.2024.41-49
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Ni Luh Putri Prabandari, I Putu Gustave Suryantara Pariartha, Silvia Gabrina Tonyes

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
1. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).




